EGS had only partial packing contribution for this project. The compressor was build and packaged in Hungary after EGS shipment. The shipment consisted of: Machined sub-skid, VRC2 compressor, coupling, 12″ suction separator (PED), Oil supply tank, Thermostatic valve, Kenco Oil Level Controller, Separator dump valve, Vibracons for motor alignment, Level switch, Sight glass, Level controller, Crankcase oil level controller, Vibration switch, Pressure cap, Fire safe valves, Spiral gasket, Scrubber level gauge, suction and discharge bottles, Arrow toolbox.